T-Junction Dig 2
1/20/01
Josh Andrews, Jeff Andrews, Steve Dalton, Terry DeFraties,
Rick Hines, and Ryan Thompson spent 3 hours today watching
Jason Percival dig. Jason and his backhoe removed
about 9 feet of clay and lose rock from a 12-foot diameter
circle around the 9-inch drilled hole. Nine feet of
overburden before
reaching bedrock was more than we expected.
The good news is we only have 109.5 feet to go. The
bad news is that the dig needs shoring (sound familiar).
Jason to the rescue. Jason operated the phone while
operating the backhoe and located a 10 foot diameter by 22
foot long steel tank that is available for salvage.
Jason is working on a plan to get the tank to the dig.
The tank if stood on end, on the now exposed bedrock,
could shore the dig, provide a secure enclosure, and
provide a high anchor point for the jackhammer work and
caver access.
Before leaving we erected a temporary fence around the
dig. Steve used his chain saw to taper a section of
cordwood that we used to plug the 9-inch hole.
I hope we can recruit Jason to be a CCC member. He
has nice toys (a backhoe, an abrasive saw, a big truck and
trailer and a jackhammer). He has local connections
that may help with material (a big tank). Most
importantly, he is enthusiastic about the dig.
Thanks to all that helped and a special thanks to Jason
Percival.
Rick Hines
|
|
|